REHLKO DOUBLES ANNUAL BACKUP POWER CAPACITY AT CHANGZHOU MANUFACTURING FACILITY
Published on 09/22/2026 at 15:20 | dgap, AD HOC NEWS| Rehlko / Key word(s): Expansion/Financing 22.09.2026 / 15:20 CET/CEST The issuer is solely responsible for the content of this announcement. Strategic Investment Program Doubles Annual Backup Power Capacity from 5.5 GW to 11 GW, Strengthening Rehlko's Global Manufacturing Network Across Asia, EMEA, and Latin America MILWAUKEE, Sept. 22, 2026 /PRNewswire/ -- Rehlko, a global industrial energy resilience platform providing custom-engineered, integrated power solutions for mission-critical infrastructure worldwide, today announced a strategic investment program at its Changzhou, China, manufacturing facility to double annual backup power capacity from 5.5 GW to 11 GW. The investment comes as demand from AI infrastructure, data centers, semiconductors, digitalization, and the broader push for supply chain resilience strains power infrastructure worldwide. ![]() Rehlko is a global industrial energy resilience platform delivering custom-engineered, integrated power solutions for mission-critical infrastructure. With more than 100 years of heritage, Rehlko is positioned at the intersection of AI expansion, grid instability and electrification. Its vertically integrated, full-lifecycle capabilities span engineering, manufacturing, deployment, servicing and operation of backup, prime, continuous and bridging power systems, accelerating speed-to-power while building long-term customer relationships and service revenue. Rehlko is a leading power solutions provider to hyperscale and non-hyperscale data centers, with an established presence across healthcare, telecommunications and industrial markets. The company has deployed more than 14 GW of data center capacity, over 90% custom-engineered for specific applications. Inventor of the world's first internal combustion engine-driven generator, Rehlko now operates across 80+ global locations, combining global scale and singular focus to power the world's critical infrastructure. Learn more at rehlko.com. ![]() 22.09.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group. The issuer is solely responsible for the content of this announcement. The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases. View original content: EQS News |
en | boerse | 70156124 |


